Lake County Logistics Center
Full design-build including civil, architectural, and MEPFP. Two buildings totaling 682,000 sf and 72 acres of sitework. Building one 550,000 sf cross dock. Building two 132,000 sf rear load.
Groveland Central Logistics
Full design-build including civil, architectural, and MEPFP. Single cross dock building totaling 876,750 sf on a 72 acre site. Project included moving more than 1M cubic yards of site fill.
NorthPort
Full design-build architectural and MEPFP. Three buildings totaling 262,000 sf and all related sitework.
Building Excellence Through Collaboration
Contact HGR Construction today to discuss your construction needs and discover how our dedicated team can bring your vision to life.